Civil Protection Documents for Your Business: Working During Air Alerts

Cost of services

from UAH 24,000
Nearest Shelter
from UAH 22,000
Safe Space
from UAH 56,000
Full Set
Civil Protection Documents for Your Business: Working During Air Alerts
4.9
Based on 700 reviews in Google

Reviews of our Clients

What we offer

  • We put in writing your people’s access to another owner’s shelter in your building or nearby.
  • We prepare an order on the safe space and notification texts if there is no shelter.
  • We draw up an air alert action plan: orders and an algorithm for employees for the yellow and red threat levels, with a route.
  • We formalize the person responsible for civil protection: for legal entities, an appointment order and the person’s instructions; for sole proprietors (FOPs), documents on their personal performance of the measures.
  • We prepare an acknowledgment sheet, an info sheet, a sign, and a notice for visitors.
  • We provide an implementation guide: what to sign, what to post, and whom to brief and when.
  • We prepare the full set of civil protection documents: orders, instructions, plans, and logs that a business keeps on an ongoing basis.

Content

What We Need from You to Prepare the Documents

List of documents
The address or addresses where you operate
The address or addresses where you operate
Whether the premises are owned or leased, and who owns the building
Whether the premises are owned or leased, and who owns the building
Whether there is a shelter in the building, on the grounds, or nearby: its address, distance, entrance, opening hours, and capacity
Whether there is a shelter in the building, on the grounds, or nearby: its address, distance, entrance, opening hours, and capacity
Whether a safe space has been designated in the building and whether there is a calculation for it
Whether a safe space has been designated in the building and whether there is a calculation for it
Whether the layout of the premises has changed
Whether the layout of the premises has changed
How many people are present at the same time—employees and visitors—and whether children or people with limited mobility are present
How many people are present at the same time—employees and visitors—and whether children or people with limited mobility are present
Who will receive the alert and direct the response, and who substitutes for that person
Who will receive the alert and direct the response, and who substitutes for that person
Which operations cannot be stopped immediately
Which operations cannot be stopped immediately
Whether you already have orders or procedures for air alerts
Whether you already have orders or procedures for air alerts

Civil Protection at Your Business: What We Prepare

Civil protection documents at a business are the orders, instructions, and plans that an employer must keep under the Civil Protection Code, as well as a set of documents for working during air alerts without a shelter of your own. We prepare both so that your procedure for working during an alert is properly documented and you have something to show during an inspection.

After the government’s new resolutions, many business owners decided that they would have to build their own shelter—and that without one, they would have to close their doors at every alert. Most people come to us with the same questions: how to work without a shelter of your own, how to formalize access to a shelter nearby, and how to protect yourself as an employer so that your documents comply with the new resolutions.

Service packages offers

Top
Nearest Shelter
Nearest Shelter
from UAH 24,000

For businesses that have another owner’s shelter in their building, on the grounds, or nearby. Medical facilities have a separate package.

  • Request to the shelter owner and arrangement for access.
  • Review of the documents on the shelter’s registration and its inspection or survey, its capacity, and available places.
  • Check of the distance and route to the shelter.
  • Order on organizing work under the threat of an air attack, with procedures for the yellow and red levels and a route.
  • Order on the person responsible for civil protection and that person’s instructions (for a sole proprietor (FOP), documents on their personal performance of the measures).
  • Staff action algorithm (instructions) during an air alert.
  • Procedure for communicating the alert to staff and visitors, with primary and backup channels and responsible persons.
  • List of processes that cannot be stopped.
  • Log of measures taken during alerts.
  • Text of the sign and the notice for visitors.
  • Acknowledgment sheet and info sheet.
  • Implementation guide and written recommendations.

* The “from” price covers one address, one employer, up to 20 people at a time, and up to two processes that cannot be stopped; the price increases for each additional address, each additional sole proprietor at the same address, and each process beyond two.

Not included: a technical survey of the shelter; without proper confirmation that the shelter can be used, we do not issue an opinion on its suitability.

Safe Space
Safe Space
from UAH 22,000

For businesses whose building has no shelter.

  • Request to the building owner regarding the safe space and its calculation.
  • Order on the safe space and the procedure for moving to it.
  • Route to the nearest shelter in case of the red level.
  • Order on organizing work under the threat of an air attack, with procedures for the yellow and red levels.
  • Order on the person responsible for civil protection and that person’s instructions (for a sole proprietor (FOP), documents on their personal performance of the measures).
  • Staff action algorithm (instructions) during an air alert.
  • Procedure for communicating the alert to staff and visitors, with primary and backup channels and responsible persons.
  • List of processes that cannot be stopped.
  • Log of measures taken during alerts.
  • Text of the sign and the notice for visitors.
  • Acknowledgment sheet and info sheet.
  • Implementation guide and written recommendations.

* The “from” price covers one address, one employer, up to 20 people at a time, and up to two processes that cannot be stopped; the price increases for each additional address, each additional sole proprietor at the same address, and each process beyond two.

Not included: the calculation of protective properties—the building owner orders it from an engineering organization.

Full Set
Full Set
from UAH 56,000

For an ordinary business without its own protective structure that is not classified as a high-hazard facility.

  • Order on the person responsible for civil protection and that person’s functional duties (for a sole proprietor (FOP), documents on their personal performance of the measures).
  • Staff instructions for emergencies or an emergency response plan.
  • Plan of evacuation measures.
  • Fire safety orders and instructions.
  • Briefing program and log.
  • Schedule of on-site drills.
  • Materials for the information and reference corner.
  • Implementation guide.

* The “from” price covers one address, one employer, up to 50 employees, and one to three groups of premises; the price increases for each additional address, each additional group of premises, and above 50 employees. When it is ordered together with an air alert package, we do not duplicate shared documents.

Not included: graphic evacuation diagrams on floor plans, training, and technical work.

Medical
Medical
from UAH 48,000

For a clinic, medical office, or pharmacy, including those that see children.

  • Employee action algorithm by threat level, with appendices for each type of care.
  • List of processes that cannot be stopped and the procedure for completing them.
  • Lowest-risk premises and the nearest shelter.
  • Persons responsible for moving patients who cannot walk on their own.
  • Plan for priority reinforcement of the premises’ protection.
  • New version of the emergency action plan.
  • Amendments to the facility’s existing documents.
  • Implementation guide.

* The “from” price covers one address, one outpatient facility, and up to two types of care that cannot be interrupted; the price increases for each additional address and each type of care beyond two.

Not included: inpatient facilities and other medical documentation—these are separate.

What Determines the Cost of the Documents

The service has two areas. The first is documents for organizing work during air alerts when you do not have a shelter of your own: we formalize the action plan, access to a shelter, or the use of a safe space, taking into account the conditions at your specific address. The second is the full set of civil protection documents that a business must keep on an ongoing basis, regardless of alerts.

The price depends on:

  • how many addresses there are and how many employers (sole proprietors, companies) operate at them;
  • your type of business: a medical facility, retail or a venue with visitors, or an office;
  • whether the shelter is in your building or nearby, or you will need to find a safe space;
  • how many people are present at the same time and whether there are processes that cannot be stopped;
  • whether you need only the air alert set or the full set of civil protection documents as well.

Civil Protection Documents at Your Business: The Full Set

Civil protection at a business means preparing the employer for an emergency, a fire, or a military threat: who is responsible, what the staff do, how people are evacuated and sheltered, and how they are trained. You may have been searching for these documents under their old name, “civil defense”: that is what they used to be called, and now they are civil protection measures under current law. Organizing them is the duty of the head of the business, who appoints a person, a unit, or an official responsible for civil protection (Article 20(2) of the Civil Protection Code of Ukraine). A sole proprietor (FOP) performs civil protection measures personally and defines employees’ actions in the work procedure; we do not automatically include for every sole proprietor the order appointing a person responsible for civil protection that is mandatory for a legal entity.

The composition of the full set of civil protection documents depends on three things: the number of employees, whether the business has been assigned a civil protection category or classified as a high-hazard facility, and whether it has its own protective structure. The sample list of civil protection documents that is often cited as mandatory is only a guide: a business’s obligations are set by the Code and government resolutions, so we determine the composition based on them.

Document

Purpose

Legal basis

Who must have it

Order on the person responsible for civil protection and that person’s functional duties

who organizes the measures

Article 20(2) and (4) of the Code

legal entities: up to 200 employees—a person from the staff; from 200 to 3,000—an official; over 3,000 at categorized enterprises—a unit; for a sole proprietor (FOP)—documents on their personal performance of the measures and on staff actions

Staff instructions in case of the threat or occurrence of an emergency

what each employee does

Article 130(1)(1) of the Code

businesses with up to 50 employees, except high-hazard facilities

Emergency response plan

the procedure for the business as a whole

Article 130(1)(1) of the Code

businesses with over 50 employees, except high-hazard facilities

Plan of measures for evacuating employees and property

where and how people are led out

Article 20(1)(4), Article 130(1)(8) of the Code

business entities

Fire evacuation plans (diagrams)

posted in visible places

Section II, para. 5 of the Fire Safety Rules

facilities for 100 or more people or with a room for 50 people; buildings of two or more floors with over 25 people on a floor; single-story buildings with over 50 people

Orders on the fire safety regime and responsible persons, instructions on fire safety measures

who is responsible, and how to handle fire and evacuation routes

Article 20(1)(20) of the Code; Section II, paras. 2–4 of the Rules

everyone

Program of the induction and annual civil protection briefing, and the log

who was briefed and when

Article 40(4) and (6) of the Code

all employers

Schedule of on-site drills and exercises

when actions upon an alert are practiced

Article 20(1)(11), Article 40(2) of the Code

everyone

Materials for the information and reference corner

what to do in emergencies at your particular facility

Article 40(3) of the Code

every business entity

Regulation on the emergency commission

who coordinates actions during an incident

para. 11 of the Regulation on the Unified State Civil Protection System

enterprises, institutions, and organizations; the Regulation sets no headcount threshold

Civil protection plan for the special period

how the business operates in wartime

Article 130(1)(3) of the Code

only those that continue operating in wartime and have been assigned a civil protection category

Protective structure documents: registration, inspections, certificate for the simplest shelter

the condition and readiness of the shelter

Article 20(1)(15)–(16-1) of the Code; Procedure No. 138; Requirements approved by Order of the Ministry of Internal Affairs No. 579

only owners (balance holders) of shelters

Accident localization and response plan

actions at a hazardous production facility

Article 20(1)(10), Article 130(1)(2) of the Code

only high-hazard facilities

 

For an ordinary small business without its own shelter, the mandatory core is as follows: a person responsible for civil protection (for a sole proprietor—their personal performance of the measures), staff instructions or an emergency response plan, an evacuation plan, fire safety, briefings, drills, and the information corner; fire evacuation diagrams—if you reach the thresholds listed above; an emergency commission—at the discretion of the head of the business. Special-period plans, accident plans, and protective structure documents concern large, categorized, and hazardous enterprises and shelter owners—we do not include them in the package for an ordinary business. You conduct the briefings and drills; we prepare the program, the log, and the schedule.

Training employees to act in emergencies is mandatory (Article 40 of the Civil Protection Code): managers and civil protection specialists receive it at courses and training and methodology centers, and we do not provide this training. Building, refitting, and commissioning a shelter, as well as a technical survey and the calculation of protective properties, are the work of design, expert, and construction organizations; they are not part of our service.

Why us

Experience after the new resolutions
Experience after the new resolutions
We have already prepared sets for working during air alerts for medical practices after the government’s new resolutions, including for a facility with two addresses and a facility that sees children.
Composition before payment
Composition before payment
We name the set of documents before payment, not after.
Less of your time
Less of your time
We partly fill in the questionnaire ourselves from public data and your documents, so less of your time is needed.
Implementation guide
Implementation guide
With every set, we provide an implementation guide, not just a set of orders.
Tailored to your premises
Tailored to your premises
We write documents for your premises, people, and processes, not for someone else’s address.
Across Ukraine
Across Ukraine
We work remotely with clients throughout Ukraine.

Our clients



You Do Not Have to Build Your Own Shelter

To operate at the yellow level, Resolution No. 1092 requires the shelter to be in the premises, building, or grounds where you work, not that it belong to you. A landlord’s shelter in the basement, a business center’s parking garage, or a shelter on the grounds of a shopping complex is suitable if it is registered as a protective structure, a dual-purpose structure, or another type of shelter and your people have access to it. In our view, another owner’s shelter in a neighboring building within 300 or 500 meters may also be a basis for operating at the yellow level—if it is suitable, has enough available places for your employees and visitors, and your people can actually reach it during an alert. For enterprises that, because of their importance to the national economy and defense, have officially been assigned a civil protection category—special importance, first, or second—the radius is no more than 300 meters, regardless of building height. A separate procedure applies to medical facilities—see below.

If there is no shelter there either, a safe space can be set up in the premises. A protective structure of your own has to be built primarily during new construction or reconstruction, when the design requires it.

We explain in detail how to find a shelter and reach an agreement with its owner in our article “Shelter for Businesses: Do You Need to Build Your Own, and How to Use the Nearest Shelter”.

Who Needs Documents for Working During Air Alerts

The documents are needed by anyone who has employees or clients on the premises during an alert. Here are some pointers for different types of businesses:

  • If you have a store or café in leased premises, you need to find out from your landlord whether there is a shelter and set out what to do with the cash register, the kitchen, and visitors.
  • If you have a pharmacy or clinic, you need documents under the separate procedure that applies to healthcare facilities.
  • If your office is in a business center, you should put in writing your access to the shelter in the parking garage or basement and how many places in it are available for your people.
  • If you are a sole proprietor (FOP) with employees, your obligations as an employer are the same as a company’s, but the scope of documents is smaller.
  • If you have several addresses, some documents will be shared, but the shelter, route, and action plan must be determined separately for each address.
  • If several sole proprietors work at one address, we collect the information about the premises once, and each of them signs their own orders.


The conditions of Resolution No. 1092 apply to all business entities, so a sole proprietor without employees who receives clients also posts a sign and determines how visitors should act.

The rules are different for kindergartens and schools: at the yellow level, classes continue only where there is an equipped protective structure. See the article “Shelter Requirements for Preschools: How to Pass State Emergency Service Inspections and Secure a License.”

Safe Space: What We Prepare

A safe space is the most protected area inside a building, set up within the existing layout and without reconstruction, where people wait out the yellow threat level. Such an area is designated by the building owner on the basis of a calculation, and its availability is communicated by a 100 × 60 cm sign reading “The facility is provided with a safe space” and by informing employees and visitors (Cabinet of Ministers Resolution No. 1092 of 04.09.2026 as amended by Resolution No. 1128 of 15.09.2026, as of November 11, 2026).

The calculation for the safe space is provided by the building owner—the balance holder. This is the party that owns the premises or shelter, or uses it under a contract, and is responsible for its maintenance. For a tenant, this is the landlord, unless the lease agreement has placed maintenance of the premises on the tenant. Who else is responsible for what is shown in the table:

What is needed

Who does it

Calculation of protection against fragments and the blast wave based on the pressure value set by the Ministry of Defense

the building owner (balance holder); in practice, it is ordered from a design or expert organization

Request to the building owner: whether a safe space has been designated, where exactly, for how many people, and on the basis of what calculation

we do

Order on the safe space in your premises and the procedure for people moving to it

we do

Text of the sign, notice for visitors, info sheet for employees

we do

Action plan: who receives the alert, what to do at the yellow level, where to go at the red level

we do

 

We do not perform the calculation itself—that is engineering work. Our part is to turn the engineers’ conclusion into orders and actions that your people understand.

What a safe space does not give you: the right to operate at the red level. For that case, your action plan must include a shelter where people go.

Documents for Another Owner’s Shelter: What We Prepare

If there is another owner’s shelter—a landlord’s, a business center’s, or a shopping complex’s—in your building, on its grounds, or in a neighboring building nearby, you do not need to build one; you need to secure access.

How far away can such a shelter be? We measure the distance the way your people will cover it: on foot, along the actual route, not in a straight line on a map. The shelter must be no more than 300 meters away in multistory, increased-height, and high-rise development, and 500 meters in low- and mid-rise development (para. 5 of Procedure No. 138). If, because of its importance to the national economy and defense, your enterprise has officially been assigned a civil protection category—special importance, first, or second—there is a single limit: no more than 300 meters, whatever the type of development (Article 54(2) of the Civil Protection Code).

When the shelter does not belong to you, we prepare the documents for it in the following order:

  1. Request to the shelter owner. We review the documents on the shelter’s registration and the latest document on its inspection or survey, any existing conclusions on whether it can be used, its capacity and available places, where the entrance and keys are, who is responsible, and whether the shelter is open during your working hours. For a neighboring building, we also check the walking distance from the farthest point where your people are present. The owner’s answer about suitability alone is not enough; this package does not include a technical survey. We check the documents on the shelter’s registration and use under Procedure No. 138, taking into account the amendments made by Resolution No. 1288.
  2. Arrangement for access. We agree on access in writing with the shelter’s balance holder or a person authorized by it to decide this matter: how many of your employees and visitors can shelter at the same time, during which hours and on which days they have access, who opens the entrance and where the keys are, the contacts of the responsible persons on both sides, and the procedure for notification of repairs or closure of the shelter. The document itself does not replace real access: if the shelter is unsuitable, has no places, or cannot be reached during an alert, the agreement is not enough.
  3. Headcount calculation. Your largest shift of employees, together with the visitors who may be present at the same time, must fit into the shelter’s available places.
  4. Order and route. The action plan, the route to the shelter, and employees’ signed acknowledgment.

If the Shelter Owner Refuses

Under martial law, people are admitted to shelters on the grounds of enterprises taking into account the procedure established by the military administration and the decision of the head of the enterprise, institution, or organization that is the shelter’s balance holder, provided there are available places and no restricted-access constraints (special rules for admitting people to a facility, established for its protection and security; para. 3-1 of the Procedure approved by Resolution No. 138). So a refusal due to a lack of places is possible. In that case, we move on to a safe space in your premises.

If the Shelter Is in a Neighboring Building

Resolution No. 1092 refers to a shelter where you work: in the premises, building, or grounds. It does not expressly mention another owner’s shelter in a neighboring building, so a regulatory ambiguity remains here.

In our view, such a shelter may be a basis for operating at the yellow level if three conditions are met:

  • the shelter is suitable;
  • it has enough available places for your employees and visitors;
  • your people can actually reach it during an alert.


The arrangement with the owner should be recorded in writing. But distance and a letter alone are not enough if it is impossible to actually take shelter. This conclusion does not automatically apply to medical facilities—see below.

Contents of the Set for Working During Air Alerts

The list below is the complete set from which we select the documents for your address. The label “required by law” means that a legal act directly requires the document or action; “our recommendation” is what we add so that you can prove compliance with the requirements.

Document

Purpose

When it is needed

Order on organizing work under the threat of an air attack

sets the procedure for staff actions upon an alert—required by law, Resolution No. 1092

always

Staff action algorithm (instructions) during an air alert—for the yellow and red levels, with a route

who does what in the first minutes, with the procedure for communicating the alert to staff and visitors through primary and backup channels and with responsible persons—defining the action and notification procedure is required by law; the algorithm format is our recommendation

always

Order on the person responsible for civil protection and that person’s instructions

who receives the alert, who is responsible for notifying people, and who substitutes—for legal entities, under Article 20(2) and (4) of the Civil Protection Code

legal entities; for a sole proprietor (FOP)—documents on their personal performance of the measures and on staff actions

List of processes that cannot be stopped immediately, and the procedure for completing them

cash register, kitchen, procedure, equipment—required by law for a medical facility, our recommendation for others

if there are such processes

Request to the shelter owner (in your building or a neighboring one) and the reply or access arrangement

records the terms of the access arrangement; we check the availability of places and actual accessibility separately—our recommendation

when the shelter is not yours

Order on the safe space

establishes the area, the procedure for moving to it, and notification—required by law if a safe space is chosen

when there is no shelter

Text of the 100 × 60 cm sign at the entrance

one of three inscriptions: “The facility is provided with a shelter,” “The facility is provided with a safe space,” “The facility is not provided with a shelter”—required by law

always

Notice for visitors

where the nearest shelter is and how to get there; visitors decide for themselves whether to stay on the premises or leave—our recommendation, required by law for a medical facility

always

Employee acknowledgment sheet and info sheet

proof that people know the action plan—our recommendation; the annual briefing is required by law, Article 40 of the Code

always

Log of measures taken during alerts

records what was done and when—our recommendation

always

Minutes of approval by the workforce

allows working without a shelter until one is set up, but no later than December 4, 2026 (as of November 11, 2026)—the approval is required by law, the minutes format is our recommendation

only until that date

Implementation guide and the lawyer’s written recommendations

how to put the documents into effect and how to act in non-standard situations—our recommendation

always

 

Why won’t a ready-made template from the internet do? The documents must match your particular premises: the number of people, the entrances, and the working hours. A template with someone else’s route will not help you during an inspection.

Answers to frequently asked questions

What Civil Protection Documents Must a Business Keep?

At a minimum, an order on the person responsible for civil protection, staff instructions or an emergency response plan, an evacuation plan, fire safety documents, a briefing program, and a drill schedule. Large, categorized, and hazardous enterprises also need separate plans, and shelter owners need protective structure documents.

Who Is Responsible for Civil Protection at a Business?

The head of the business: they organize the measures and appoint a person responsible for civil protection at the business. In a business with up to 200 employees, this is a person from the staff; in larger ones, an official or an entire unit. A sole proprietor (FOP) performs civil protection measures personally and defines employees’ actions in the work procedure.

Do You Have to Build Your Own Shelter?

No, a shelter of your own is not needed in every case. To operate in an existing building, we assess the shelter in it or on its grounds, or a safe space. In our view, an accessible shelter nearby may also be a basis for operating at the yellow level if it is suitable, has enough available places, and offers real access during an alert. Medical facilities have separate rules.

Can You Operate During an Alert Without a Shelter?

At the yellow level—only with the approval of the workforce and only until a shelter is set up, but no later than December 4, 2026 (as of November 11, 2026, the deadline has not changed). After that, you need a shelter in your building or on its grounds, or a safe space; for non-medical businesses, we assess a neighboring shelter against the three conditions and the legal position explained above. At the red level, people must move to a shelter; medical facilities operate under a separate procedure.

Do You Need a Separate Set for Each Address?

Partly. We do not duplicate shared documents, such as the order on the responsible person, but we prepare the shelter, route, action plan, and sign separately for each address.

For Medical Facilities: A Separate Procedure

For clinics, pharmacies, and other healthcare facilities, the government has established a separate procedure—Resolution No. 1158 of 21.09.2026. At the yellow level, such facilities do not stop operating; if there is no shelter in their premises, building, or grounds, they operate with the approval of the workforce and for no longer than the period set by Resolution No. 1092, that is, until December 4, 2026 (as of November 11, 2026). A shelter in a neighboring building does not automatically give a medical facility the right to operate at the yellow level after December 4, 2026: Procedure No. 1158 separately sets a condition regarding a shelter in the facility’s premises, building, or grounds (para. 5, second paragraph, of the Procedure).

At the red level, the facility continues operating, and employees move to the shelter—or, if there is no such shelter, to the nearest available one or to the lowest-risk premises; those who are completing care that cannot be interrupted, receiving patients, or monitoring critical equipment remain in place (paras. 6, 7, and 17 of the Procedure).

The head of the facility approves the employee action algorithm by threat level and determines the lowest-risk premises, the nearest shelter, the processes that cannot be stopped, and the persons responsible for moving patients who cannot walk on their own (para. 31 of the Procedure). The deadline for this—one month from the entry into force of Resolution No. 1092—has already passed, so a facility without these documents prepares them now.

To the medical set, we add algorithms for each type of care, a procedure for vaccinations (post-vaccination observation at the red level continues in the shelter in the presence of a medical worker), a plan for reinforcing the protection of the premises, and amendments to existing documents. We prepare the rest of the medical documentation as part of our “Drafting Medical Documentation” service.

How We Work

Step

What happens

1. Short questions

we send you a questionnaire; we fill in some of the answers in advance from the public register and your documents, and you only need to check them

2. Set composition

before we start, we tell you which documents you need and why

3. Preparation

we draft the orders, the action plan, the instructions, and the texts for signs and notices

4. Delivery

we send the set in a separate folder with an implementation guide

5. Putting into effect

you approve the orders, post the notices, and brief your employees; we answer your questions

 

We work remotely with clients throughout Ukraine.

Timeframes and What We Guarantee

The timeframe depends primarily on how quickly you answer the questionnaire: collecting the information takes longer than the preparation itself. In our cases, the set for working during air alerts was delivered within a few days. The full set of civil protection documents takes longer—it contains more documents and more information about the facility.

We guarantee a set of documents drafted in line with the rules in force on the date of preparation, and clear instructions on how to put it into effect. We cannot guarantee the shelter owner’s decision on access, the outcome of an inspection by the State Emergency Service of Ukraine (SES), or that the rules will not change—in which case the documents will need to be updated—nor that the documents by themselves give you the right to operate: that right comes from a suitable, accessible shelter or a safe space, and the documents formalize and confirm it.

How to Get Started: What to Send Us

Civil protection at a business is not about construction—it is about order: who is responsible, where people go, and which documents confirm it.

If you do not know whether you will have to build your own shelter, whether you can avoid closing your doors at every alert, and what to show during an inspection, let’s start with your address and premises.

Submit a request on our website or call us—we will prepare documents that let your people know what to do during an alert and give you, as an employer, something to show during an inspection.

Update date 17/11/2026

We are ready to help you!

Contact us by mail [email protected] or by filling out the form:

Our publications on this matter