Hybrid Generation Systems (RES + Storage): Legal Aspects of Securing a License

Cost of services:

from 48 000 UAH
Electricity Generation License
License for production of electric power
4.9
Based on 600 reviews in Google

Reviews of our Clients

The renewable energy market in Ukraine is gradually shifting from conventional solar and wind power plants toward more complex hybrid solutions that combine power generation with energy storage systems. These installations allow for more efficient utilization of generated electricity, reduce grid load, enhance facility stability, and open up additional opportunities for market participation.

However, integrating an energy storage system (ESS) into a solar or wind power plant raises several legal questions. Specifically, businesses frequently inquire whether a separate electricity storage license is required if the accumulator operates exclusively within the generating facility, and what specific NEURC regulations apply to such projects.

This text is being translated.

Publication date: 27/07/2026


Our clients



We are ready to help you!

Contact us by mail [email protected] or by filling out the form: